Reserve packjob by riggers of Skylife includes: complete preliminary inspection, checkups of presence of all the bulletins and modifications recommended by the manufacturers, and preventive protective maintenance or current repairs. And, of course, the packing is performed in accordance with all manufacturer instructions.
To implement all these activities including ventilation and drying we need 2 working days. In some cases you can arrange with the rigger to rig the system faster.
Rig assembly (main and reserve parachutes, AAD, technical inspection) | 55$ |
Packing main and reserve parachutes, technical inspection | 40$ |
Tandem rig assembly (main and reserve parachutes, AAD, tech inspection) | 80$ |
Tandem rig packing (main and reserve parachutes, tech inspection) | 60$ |
Container washing (+disassembly) | 40$ |
Leg pads shortening | 30$ |
Leg straps shortening | 10$ |
Sewing on the additional straps underneath the buckle | 10$ |
Kicker flap plastic replacement | 30$ |
Shoulder flap plastic replacement | 30$ |
Shoulder flaps improvement (in case of unintended opening) | 40$ |
Shoulder flaps improvement (in case of unintended opening) | 40$ |
Main bridle collapse replacement | 15$ |
Drogue bridle collapse replacement | 30$ |
Steering line replacement (a pair of lines to be replaced) | 35$ |